What We Do

Services

Here's the full list of what we build, fix, and refinish.

Home › Services

Everything we take on

Every job below is one we do ourselves across Rancho Cucamonga.

Deck Installation

We build new decks from the footings up, using concrete piers set below grade and joists sized for the actual load, not just code minimum. Framing gets galvanized or stainless hardware throughout, since the dry heat here and the occasional downpour both work against cheap fasteners. We can frame a simple rectangle off the back door or a multi-level layout that steps down with the yard.

Deck Repair

Most repair calls start with a soft spot underfoot, a post that's shifted, or a railing that wiggles when you lean on it. We pull the bad boards or hardware, check the framing underneath for rot or termite damage, and rebuild only what's actually failed. A repair doesn't always mean tearing out the whole deck, but we'll tell you straight if it does.

Deck Staining & Sealing

Sun in the Inland Empire fades and dries out wood decking faster than most people expect, usually within two to three years of the last coat. We pressure wash first, let the wood dry fully, then apply a penetrating stain and sealer rated for UV exposure. Skipping this step is how boards start cupping and splitting.

Custom Deck Design

We'll talk through how you actually use your backyard before drawing anything, built-in bench seating, a pergola over part of it, stairs that land where you actually walk. Multi-level decks get engineered separately for each level's load path. Layout decisions get made on paper, not figured out halfway through framing.

Composite Decking Installation

Composite boards don't need restaining, don't splinter, and hold up better than wood against the California sun over the long run. They do need proper joist spacing underneath, usually 12 or 16 inches on center depending on the brand, or the boards will sag between supports. We install Trex, TimberTech, and a few other lines depending on what you're after.

Deck Framing & Structural Repair

This is the part under the boards that nobody sees until something's wrong, ledger connections, joist hangers, posts and footings. A ledger board nailed instead of lag-bolted or flashed is the single most common failure point we find on older decks. We re-flash, re-bolt, and bring footings up to current code when we touch structural work.

Deck Railing Installation

California code calls for guardrails at 36 to 42 inches with baluster spacing under 4 inches, and a lot of older decks don't meet either number anymore. We build and install railings that pass inspection and don't flex when someone leans on them. Cable rail, wood baluster, or metal panel, whatever fits the look of the house.

Deck Resurfacing

If the frame underneath is still solid but the decking itself has had it, we strip the old boards and lay new decking over the existing structure. This costs less than a full rebuild and takes a fraction of the time. We check joist spacing first, since older framing sometimes needs sistering before new boards go down.

Pergolas & Deck Covers

A lot of decks in this area get more use with some shade over at least part of them. We build pergolas and covers that attach to the existing deck framing or stand on their own footings, depending on what the structure underneath can actually handle.

Deck Demolition & Removal

Sometimes the right move is tearing the old deck out and starting over, especially if the framing's rotted past the point of patching. We haul off the old lumber and sweep the site for stray nails before any new footings go in.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Rancho Cucamonga, CA

Deck work is scheduled by drive time, so check if your city is on the list.

Rancho Cucamonga, CA
Riverside, CA
San Bernardino, CA
Fontana, CA
Ontario, CA
Corona, CA
Chino, CA
Upland, CA
Chino Hills, CA
Redlands, CA
Claremont, CA
Common Questions

Things worth asking

Questions that come up once a deck project is actually underway.

Do I need a permit for a new deck?
Most California cities require a building permit for any deck higher than 30 inches above grade or attached to the house structure, including footing and framing inspections before the decking goes down. Low decks under 30 inches and not attached to the dwelling sometimes qualify for simplified permitting, but local building departments vary on this.
How long does it take to build a deck?
A straightforward deck under 300 square feet typically takes one to two weeks to frame and finish once permits are approved. Larger multi-level decks, built-in features, or custom railing can push the timeline to three or four weeks of on-site work.
Can a deck project be built to a set budget?
Deck contractors can usually adjust scope to fit a budget by changing decking material, simplifying railing, or reducing square footage rather than cutting corners on framing or footings. The structural parts, footings, joists, and the ledger connection, are not where cost should get trimmed.
Do deck contractors guarantee their work?
Reputable deck contractors back workmanship with a written warranty, commonly one to five years on labor, separate from manufacturer warranties on materials like composite decking, which often run 25 to 50 years. It's worth asking what's covered under labor versus material before signing a contract.
Who handles day-to-day communication during a deck build?
On most deck jobs, a single project lead or crew foreman serves as the main point of contact for scheduling, material decisions, and any changes that come up. That person should be reachable by phone throughout the build, not just at the start and the end.
What decking material should I choose?
Pressure-treated wood costs less upfront but needs restaining every two to three years in a sunny climate, while composite decking costs more initially but needs only occasional washing and holds its color far longer. Cedar and redwood fall in between on cost and need similar maintenance to pressure-treated lumber.
Can I still use my yard while a deck is being built?
Yard access is usually limited near the active work area for safety, especially during footing excavation and framing, but the rest of the yard typically stays usable. Pets and kids should stay clear of open footing holes and lumber staging areas until the crew leaves each day.
How should I prepare the site before deck work starts?
Clearing furniture, planters, and grills away from the existing deck or build area lets the crew start on schedule without delays. Marking any sprinkler lines or underground utilities near the footing locations ahead of time also avoids mid-job surprises.
What happens if rot or damage turns up once the old decking comes off?
Hidden rot in joists, ledger boards, or posts is common once old decking is removed, especially around the ledger connection to the house where water collects. A reputable contractor will stop, show the homeowner the damage, and quote the additional framing repair before proceeding rather than hiding it under new boards.
How should a new deck be maintained afterward?
Wood decks need re-staining every two to three years in a sunny climate and a yearly check for loose fasteners or soft boards. Composite decking just needs periodic washing with soap and water, but railing connections and footings on any deck should be checked annually regardless of material.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (909) 352-4683